Dyckman Street Bridge

New York, NY

arches

Scope:

  • Power Washing/Cleaning of all concrete surfaces followed by a four(4) coat system of Keim Concretal Water Barrier Coating.
  • Power Tool Cleaning SSPC SP 3 of bridge railings and application of a three(3) coat epoxy system.

Sequence of Work:

  • Installation of MPT/Roadway protection.
  • Installation of containment system for power wash and coating activities.
  • Application of Keim Heavy Duty Cleaner and subsequent power-washing of all concrete surfaces.
  • Application of four (4) coat Keim Concretal Water Barrier coating system.
  • Power Tool cleaning of structure railings to SSPC SP3 and subsequent application of Sherwin-Williams Epoxy coating system.

 