Naval Air Station

share
image_alt

Scope

All surface preparation and coatings for the tank exterior and interior of Tank 944 (45’ x 19’) at Naval Air Station Key West, FL. (2019)

Total SF (interior & exteriors): 10,548

Champion deployed a five-man crew 185 miles from our Southeast region office in Fort Lauderdale, FL. Work began on August 7, 2019 and finished on October 5, 2019. Due to the specified coatings systems, extreme summer heat, high humidity, proximity to the ocean, and near-daily precipitation, this tank required full scaffolding, shrink-wrap containment, dehumidification, and temperature control with 24 hour monitoring.

Exterior access was facilitated with a full scaffold system. Interiors were accessed with rolling scaffolds. Champion completed surface preparation with dry abrasive blast as requested by the GC. Even with a U.S.G. mandated shutdown to prepare for Hurricane Dorian (conducted in accordance with DoD HURCON procedures), the project was completed on time and budget. Additionally, SSPC conducted periodic QP-1 and QS-1 audits on Champion during the project IAW certification requirements, both of which the company successfully passed.

Exterior Specification: UFGS 09 97 13.27

Exterior Surface Preparation: SSPC-SP-10 AB (Abrasive Blast with Coal Slag)

Exterior Coatings System: Sherwin Williams

  • Primer: MIL-DTL-24441/19C TYPE III FORMULA 159 EPOXY POLYAMIDE ZINC RICH PRIMER @ 3.0-5.0 mils DFT
  • Intermediate: MIL-DTL-24441D TYPE IV FORMULA 152 EPOXY POLYMIDE @ 3.0-5.0 mils DFT
  • Topcoat: MIL-PRF-85285E, TYPE II HIGH SOLIDS POLYURETHANE @ 2.0-3.0 mils DFT

Interior Specification: UFGS 09 97 13.17

Interior Surface Preparation:  SSPC-SP-10 WAB (Wet Abrasive Blast with Coal Slag)

Interior Coatings System: Sherwin Williams

  • Primer: MIL-DTL-24441/29 TYPE IV FORMULA 150 EPOXY POLYMIDE @ 3.0-5.0 mils DFT
  • Intermediate: MIL-DTL-24441/31 TYPE IV FORMULA 152 EPOXY POLYMIDE @ 3.0-5.0 mils DFT
  • Topcoat: MIL-DTL-24441/31 TYPE IV FORMULA 152 EPOXY POLYMIDE @ 3.0-5.0 mils DFT
Read More

Project Details:

Date: 05.21.2020

Prepared: Daniel Gibbens

Project: API 653 Repairs – Tank 944

General Contractor: Goshawk

Customer: NAVFAC

Services:

Coatings

Tank Lining